Your schedule
Each DOB inspection on the floor it covers
We read DOB and OATH each morning and match every permit, inspection result, sign-off, violation and
summons to its trade, floors and drawing sheets in your scheduling software, through its export or API.
Each row shows the next inspection and the last missing sign-off. A failed result becomes a work order for the sub that quotes the inspector
and names the sheet. The timeline is on the trailer wall and the foreman's tablet.
- Each floor's inspections and sign-offs on one row, under the job's permits
- Each line shows when the city last updated it, or when we last read it: some records post daily, some lag by weeks
- Greenstar never holds your logins; every filing goes out from your own licensees' DOB accounts
Greenstar · 6:31 AM1234 Example Ave, FL 06 electrical rough-in: FAILED, 1 item
(cable not secured at boxes, corridor). Matched to your electrical sub and sheet E-601. Drywall on the FL 06 corridor waits on this.